SERVICE PROJECTS
Dedicated to excellence and innovation, Goyette Mechanical delivers top-tier mechanical contracting services with a commitment to quality, safety, and customer satisfaction.
Goyette Mechanical Services provides comprehensive mechanical, electrical, and controls solutions for commercial and industrial facilities. Through our Service Projects division, we specialize in full design-build delivery—thoughtfully addressing efficiency, budget, building use, and long-term plans to ensure reliable performance, quality craftsmanship, and efficient project execution.
In-House Quality Control Program
Quality is built into every project we complete. Goyette Mechanical employs a full-time Quality Control Inspector who conducts scheduled site visits throughout the project lifecycle to ensure our work meets the highest standards and exceeds customer expectations. As part of our quality assurance process, we document completed work through photography and gather direct customer feedback to verify satisfaction and maintain accountability on every project.
Trades We Service
Heating & Cooling (HVAC)
- Root Top Units
- Split Systems
- Furnace/AC
- Ventilation & Exhaust
- Refrigeration systems
- Walk In Coolers/Freezers
Hydronic Systems
- Boilers
- Chillers
Plumbing
- Remodels
- Fixture Replacement
Electrical
- Lighting Upgrades
- Panel Upgrades
Types of Projects
Dort Federal Event Center
The Dort Event Center underwent a significant infrastructure upgrade to improve both performance and reliability. Work included replacing two 3 million BTU boilers for the building’s heating system, a complete overhaul of the domestic water equipment with new boilers and storage tanks, and improvements to the concession stand to better support day-to-day operations and event demand.
Location
Flint, MI
Marion Crouse
Marion Crouse experienced a key heating system upgrade with the replacement of two 1.8 million BTU boilers and their associated pumps. This work improved overall system reliability and efficiency, helping ensure consistent and dependable building performance.
Location
Flint, MI
Henry Ford Genesys Health Club
Henry Ford Genesys Health Club underwent a major HVAC system upgrade, including the replacement of 28 rooftop units and a building management system (BMS) controls upgrade. This work improved overall system efficiency, reliability, and facility-wide environmental control.
Location
Grand Blanc, MI
Cranbrook Schools Snowmelt
Cranbrook Schools received critical campus infrastructure improvements with the installation of underground snowmelt piping for key walkway areas. This system enhances winter safety and accessibility by helping keep pedestrian paths clear of snow and ice.
Location
Bloomfield Hills, MI
BioMat
BioMat completed the full electrical build-out for a food processing facility, including installation of main panels and power distribution systems. The project also included full rough-in and finish work for electrical power and lighting, ensuring a reliable and efficient infrastructure to support day-to-day operations.
Location
Inkster, MI
SA Automotive
SA Automotive required a specialized exhaust venting system to support manufacturing equipment operations. The project included installation of stainless steel spiral ductwork, structural supports, and custom adapters to ensure secure, efficient equipment connections and reliable airflow performance.
Location
Webberville, MI
Hilton Hotel
Hilton Hotel underwent a comprehensive plumbing remodel across its 14-story facility. The project included underground utilities, full rough-in and finish plumbing, and upgrades to hot water distribution and boiler systems. Additional scope covered specialized plumbing for the commercial kitchen, restaurant and bar areas, and laundry facilities to support high-demand hotel operations.
Location
Flint, MI
Crew Mags
The Crew Mags project featured a full mechanical and plumbing build-out for a 90,000 sq. ft. cultivation facility, including process piping, domestic plumbing, and irrigation systems. This infrastructure was built to ensure reliable performance and precise environmental control across the growing operation.
Location
Flint, MI













































